Davisite Banner. Left side the bicycle obelisk at 3rd and University. Right side the trellis at the entrance to the Arboretum.

Category: Bicycling

  • A Tale of Two Crossings: Nothin’ from nothin’ leaves nothin’

    * If Nishi can't be built, there's nothing to trade as a mitigation
    * Dedicated bike-ped crossing of the Yolo Bypass was quietly cancelled after years of promises.

    NishiPLcomparison1

     

    Tonight's City Council Agenda item on the 80 Yolo Managed Project was already covered critically and nearly exhaustively last weekend in the Davis Enterprise and yesterday here in the Davisite and in the Davis Vanguard.

     

    A Bridge That Can't Be Built…

    I arrived in town after Nishi 1.0 (retroactively supported a concept that would involve a complete redesign of the 80-Richards interchange inclusive of a parking structure and Park & Ride for regional buses which would have minimal impacts on Richards) and was against Nishi 2.0 because I don’t think that there should be housing (buildings with windows people open!) so close to the noisy and arguably otherwise-polluting interstate, but it’s not why I am suggesting that the proposed “multi-modal” mitigation is a fallacy. I agree with others that no VMT mitigations should happen with this project, and am trying to make clear that the plan of Caltrans and its erstwhile partners are also a mess from a technical point of view. (There's also the sheer ironic delight of trying to facilitate the construction of a project using these VMT credits – as it were – to make the Nishi space noisier and more polluted next to a widened interstate.)

    The 80-railway corridor is a wall for people on bikes, but so is the railway on its own.  See Pole Line over 80 at lower right in the illustration above. It’s incredibly long because it has to go very high over the railway tracks, more so than to get over 80 itself (to better understand this, picture the crossings over 113 which are much lower as they only need to accommodate trucks.) First of all, this – and all the over-crossings of 80 in town – are simply not comfortable and suitable for people on normal bicycles, especially carrying children, and especially if they can make the journey by private motor vehicle or e-bike.   The over-crossings have around a 6 to 7% grade, nearly twice as high as the Dutch standard: So to make it comfortable for hundreds of people to go from Nishi to campus it would have to be nearly twice as long. Look again at the view of 80 at Pole Line: There’s no space for this unless it’s very circuitous and indirect and lands behind the Shrem Museum or just by the entrance to Solano Park from Old Davis Rd. (The red line in the top of the image is only as long as Pole Line, and it needs to be much longer.) And that’s just for cycling. Imagine walking this at least twice a day. Motor vehicles including buses can obviously do this, but that's no one's definition of "multi-modal".

    I feel confident in saying that since a motor vehicle, bus, bicycle and walking connection is part of the agreement for Nishi, and as Union Pacific forbids an under-crossing, there’s no way to build Nishi unless it’s returned to the voters. There’s nothing to mitigate here as nothing can be built for mitigation.

    ***

    A Cancelled Crossing…

    For years a dedicated and new bicycle-pedestrian bridge across the ‘Bypass was promised in the project. In 2020 – when I was still on the Bicycling, Transportation and Street Safety Commission (BTSSC) – the notification that it was dropped some months earlier was only indirectly mentioned in a summary for a BTSSC meeting by the primary liaison for the City of Davis at the time, Brian Abbanat (former City of Davis Senior Planner; now he’s in a similar role for Yolo County and co-presenting Tuesday evening.) A couple of years later when this was mentioned to the other co-presenter, YCTD head Autumn Bernstein, she said it was not funded: I believe that the aggregate truth – to be precise as possible – is that Caltrans dropped it, never told any of the local interested groups about it (e.g. Bike Davis, Davis Bike Club) through their liaison Abbanat and that it wasn’t part of the initial, funded proposal to the Federal Government. Our City, County and State government representatives were silent about this betrayal in our so-called "USA cycling capitol".

  • Tree Davis to Observe National Arbor Day with City of Davis and Enterprise’s Bob Dunning

    2021 Bike Tour 1 (1)

    (From press release) Saturday, April 29, marks National Arbor Day, and Tree Davis will celebrate it by offering two, free events at 8 a.m.: a bicycle ride/tree tour and a celebration at Central Park with the City of Davis and journalist Bob Dunning. Mayor Will Arnold will also attend the event and read the City’s proclamation.

    Starting at 8 a.m., the fifth edition of the “Great Tree Search Bike Tour” will begin with coffee and donuts at the North Davis Pond parking lot, located at Anderson Road and F Street. At 8:30 a.m., Board President Greg McPherson will begin the six-mile tour with stops at several ecological restoration projects. In addition to visiting Great Trees, the tour will include outstanding examples of tree shaded streets and parking lots. Riders will learn about the past, present, and future of the Avenue of Trees along West Russell, then finish at noon at Central Park to join the ongoing celebration.

    At the same time, from 8 a.m. – 1 p.m., an Arbor Day Celebration will be taking place at Central Park. Tree Davis, City of Davis, UC Davis Arboretum, CAL FIRE, West Coast Arborists and other urban forestry champions will be available to chat with attendees about the importance of trees in the face of climate change. At noon, Bob Dunning will lead a discussion at the event about the history and impact of Davis’ trees, alongside city staff and other community leaders.

    Attendance for both events is free, though registration for the bicycle ride is necessary, at:  www.treedavis.org.

  • Arborealis legalis persona

    IMG_20210406_193259

    An earlier illegal dump of yard waste on East Covell. Imagine being on a bike at this location…

    That's Latin for "Legal personhood of trees".

    Part One:

    So that was fun. I was working and came across a huge mother f****** pile of yard waste in the bike lane on westbound Arlington in front of Harding Terrace. This is, of course, strictly illegal. I went to three of the homes here and one guy was nice the other two said they didn't know anything about it.

    No surprises so far.

    I called the Davis Police Dept non-emergency line and they said they can't do anything about it until the morning and I could be connected to code enforcement or whatever. The lack of surprises continue. 

    Still no surprises.

    I asked what if it was yard waste blocking a traffic lane they said no they wouldn't come until tomorrow morning because it doesn't constitute an emergency.

    The lack of surprises continue.

    Then I asked t if it was a tree branch that fell into the traffic lane or the bike lane. They said that would be an emergency and they would have to dispatch a crew to deal with it immediately.

    So in other words… if you want to block a traffic lane or a bike lane, be sure to use the right part of a tree!!

    * Pretty much the only time I contact the police or CHP is when there's a potential of traffic violence, such as assault using intentionally-placed yard waste in bike lanes.

    Fakeplastictrees

    Part Two: There is no "Holiday Tree" in Davis. 

    I am Jewish. Christmas is a fine and a lovely tradition. I am happy to celebrate it with friends who do. 

    There is no "Holiday Tree" in Davis. It's a Christmas Tree. 

    All the activities at the City's "Candlelight Parade and Tree Lighting Ceremony" refer to Christmas or the northern Winter. 

    Why is it called a "Holiday Tree"? It's because some years back various parties sued various entities across the country to remove mentions of "Christmas" in government activities. 

    I am fine with the City co-organizing and co-sponsoring this, because most people in the City celebrate Christmas in one form or another. It's certainly a vital issue that a truly enlightened city council should address if other holidays that residents celebrate are not observed in equal proportion in terms of e.g. staff time and finances, all year round. While I am not sure if there's an e.g. Kwaanza or Hanukkah song etc in the choir program, it would just be tokenism. (These are just examples — there are other holidays around this time celebrated by many in the region, including the Eastern Xmas in early January). 

    Calling the Christmas Tree a "Holiday Tree" is like referring to the Hanukkiah (the eight-candle menorah used for Hanukkah) as a "Holiday Candlebra" or Dia de los Muertos as "Mexican Halloween". It's a well-intentioned but very sloppy bit of false-inclusivity. As such, and because we're paying for part of it, it's a lie. Because is it's a lie about cultural and sometimes religious traditions, it's discriminatory. It has no place in any city, especially one whose leaders wave the flag of equity every chance they get. Keep the Christmas Tree, but please start calling it that. (There's an obvious argument some could make that "Holiday" refers also to New Year's, but the transition period from December 31st to January 1st is only the Gregorian New Year — again, representative of a large proportion of the population, but far from nearly everyone).

    The above repeated and Next Door discussion in this Google Doc copy. (For Next Door users from certain neighborhoods in Davis, here is a direct link)

    Allen-michael-geneta-lotr-ent-fixa

    Two members of Tree Commission searching for Entwives with Street Tree Defenders. Source: https://allentotingski.artstation.com/projects/rRPVQ2
  • Great Tree Search Bike Tour

    Image1(From press release) Tree Davis will kick-off its 2022-23 tree planting season with a bike tour. Beginning at 8:30am on Saturday, September 24, coffee and donuts will be served under the shade of a 22-year old Texas red oak and thornless mesquite at 1009 Kent Dr. At 9am Dr. Greg McPherson will lead a 6-mile tour with stops at 9 Great Trees. The tour will finish at the Farmer’s Market at 11:00am.

    This will also be a fun opportunity to participate in the City of Davis’ Urban Forest Management Plan Photo Contest. Snap photos of your favorite trees along the biking route! Submission for the photo contest can be shared here: https://www.treedavis.org/city-of-davis-urban-forest-management-plan-photo-contest/

    Tree Davis has asked residents to nominate Great Trees and 33 specimens have been recorded in one of four categories: Unusual Size, Species, Form and History. The Great Tree Search is helping residents better understand and appreciate the educational, environmental, and cultural contributions of our trees.

    This annual community event is fun for the whole family. We hope you will join us in celebrating our great trees!

    Sign up for the Great Tree Search Bike Tour at https://tinyurl.com/GTSBikeTour

  • Part 4 Candidate Responses to the Sierra Club Yolano Group Questionnaire for the 2022 Davis City Council Election

    Sierra-club-yolano

    Transportation Management

    Introduction – As has been our custom for over 20 years, the Sierra Club Yolano Group prepares a wide-ranging questionnaire and presents it to candidates in races of interest to our local membership. The questionnaire for the 2022 Davis City Council race received answers from all 5 candidates in the 2 of the 5 City Council Districts for which an election is held in November, 2022.

    The candidates, listed in alphabetical order by their first name, are:

    District 1 (West Davis): – Bapu Vaitla, Dan Carson, and Kelsey Fortune

    District 4 (East Davis ) – Adam Morrill, Gloria Partida

    Questions were asked in the following general categories :

    Part 1 – Land Use and Housing Development – Peripheral Development

    Part 2— Land Use and Housing Development – Downtown Core and Student Housing

    Part 3 – Energy Use and Greenhouse Gas Emissions

    Part 4Transportation Management

    Part 5 Toxics in the Environment and Other Environmental Issues

    Part 6Waste Management and Financial Contibutors

    Parts 1 through 3 in this series can be viewed by clicking on that article's title above which is linked to the earlier publication.

    This is the 4th in the series of articles and focuses on Transportation Management and provides candidate responses to the following questions:

    Question #1 – Bicycle Use

    Davis prides itself on being a bicycle-oriented city with miles of bike lanes and paths throughout the community to facilitate bike use as an alternative form of transportation. Yet, the bicycle mode-share in Davis has dropped in recent years.

    What would you propose to make the bicycle a more viable and safe transportation mode in Davis?

    Question #2 – Downtown Parking Structure

    Do you support the construction of a new automobile parking structure near or in the downtown core and why or why not?

     

    If yes, where would you like to see it located, how large should it be, and how should it be paid for?

    Question #3 – Downtown Parking Meters

    Do you support the addition of parking meters on downtown streets or in downtown city-owned public parking lots or parking structures and why or why not?

    Subsequent articles in the series in the coming days will focus on the two remaining general categories in Parts 5-6.

    (more…)

  • Kelsey Fortune Announces Her Candidacy for Davis City Council in District 1

    Fortune_smaler

    >>from press release<<

    I am honored to announce my candidacy for Davis City Council in District 1.

    I was raised in small town Wisconsin to believe everyone should play an active role in shaping their community. I moved to Davis nine years ago to pursue my PhD in economics, determined to live in accordance with my values for respect, inclusion, and sustainability. I use my bicycle as my main form of transportation and have woven close relationships with a wide variety of people through my involvement in our community. I volunteer my time as the Associate Director of Purple Tree Cafe and on the Boards of Bike Davis and Cool Davis.

    Faced with a climate emergency that threatens to exacerbate already unacceptable levels of inequality and is currently degrading our environment, I believe our diverse and compassionate community is our greatest strength. I see untapped potential for progress and action in the City of Davis. The people and elected leaders who came before us laid the groundwork for a vibrant, sustainable community, and our city government and citizenry can again become an example of an equitable and effective response.

    The city is also faced with an unsustainable budget, a public safety and justice system that does not best serve the people, an extreme dearth of both affordable and dedicated low-income housing, and lack of transparency, effective communication, and action from our City Council. Our children’s future depends on our ability to act now to address these problems.

    That’s why I’m running for Davis City Council in District 1.

    ______________________________________________________

    For more information, contact FortuneForDavis@gmail.com,  530-220-2001

  • A Failure of Equity – Racist and Ableist Bike Share Returns to Davis

    E6a0ce4fef1b41a4a3839f8c0e6cd132At the city council meeting tonight a pilot for e-bike and e-scooter share will likely be approved – and will start by September. 

    Bike share and scooter share are great things, despite all sorts of issues. Electric assist makes these "micromobility" devices even more of a joy. More and more bike share systems offer e-bikes, sometimes exclusively. Scooter share was always electric.

    But as with Jump bike share – which ended in Davis a little over two years ago – the minimum age limit for use for bikes will be 18. Once again this age limit makes it racist.
     
    Why is it racist?
     
    It's simple: Youth have fewer mobility choices, even more so if they're members of economically-vulnerable households. Brown and Black people are over-represented in these households. There's no minimum age for using the type of bikes supplied by Lime. There's no formal impossibility for parents and guardians to take legal responsibility for necessary contracts. Therefore… it's arbitrary… and this means it's racist. It's doesn't mean that the City Council is racist. It means that unless we change their minds they are making a racist decision tonight.
     
    Once again the speed is limited to 15 mph assistance without any evidence that this has any benefits for safety. Nor only does this make the bikes less competitive with automobiles, the speed assistance limit below what state law allows is biased against less strong people who might find it harder to get their bikes over 15 mph. This is probably ableism, yes?, or something else which City documents and various statements of the current City Council would naturally disavow.
     
    Many other cities have much less racist and ableist systems
     
    There's no minimum age for the use of type 1 e-bikes, which will be the type supplied by Lime. The minimum required for use of an e-scooter in California is possession of a learner's permit, and being 16. However the Lime-supplied pilot requires a minimum age 18 for that as well. That's two years when kids can drive a car most of that by themselves before they can use bike share or scooter share in Davis. Bike share systems all over California and the USA allow users under age 18 (For example the system in Philadelphia allows 16 year-olds to use their e-bikes and 14 year-olds their "acoustic" bikes.) But we're the USA cycling capital! (Perhaps it's time to change our official City logo – to purge this anachronistic and anti-egalitarian high-wheeler bicycle from our community imagery?).
     
    A major innovation that Davis can make here is by replacing the age cut-off with one based on peers. This is because the majority of youth have friends that are in the same grade. Not everyone in the same grade is the same age: We see this manifested when some high school students can get licensed before their friends. 14 would work – nearly everyone that age is tall enough to ride the Lime bikes – but connecting it with entrance to high school would still be much better than the current situation. See details below – this will get many on bikes at age 15.  And then on e-scooters at age 16! Voila! Bikequity!! Fairscooterism!
     
    Another good – and perhaps still innovative – new feature is that the park in the street like a motorcycle thing is a clear part of the rules. (This was done spontaneously by many Jump users and almost went forward officially before the bike share system was removed from Davis and UC Davis due to COVID.) However there's still a huge amount of the contract and rules based on the idea that the bikes will need to be moved within 90 minutes if there are badly parked. (In the pilot it's allowed to park like this in Downtown, but it's not even clear that there will be a sticker on the bikes to advise people of this. It's not really intuitive.)
     
    The City Council has known about this issue for years
     
    In March 2019 – when I was a member of the Bicycling, Transportation and Street Safety (BTSSC) -  I created a lengthy report on the one year anniversary of bike share in Davis and UC Davis. I was able to initiate what became a unanimous vote to ask the City Council to ask its partners at SACOG – and the previous operator Uber/Jump – to consider lowering the age (and raising the weight limit). This sat on the long-range calendar until shortly after Uber removed the bike share system from Davis and UC Davis.
     
    The other day I confirmed with Lime and that neither the e-bikes nor the e-scooters will have a maximum weight limit. That's good – the newer e-scooters are generally considered to be more robust than those available just a couple of years ago.
     
    Oh, last time the DJUSD Board of Education was asked to support an under-18 age limit.. they were not interested. This may have been in 2019 – a partly-different board.
     
    What to do?
     
    Thank the City of Davis City Council for bringing back bike share and introducing scooter share, BUT:
    * Demand that they allow the use of Lime e-bikes from the first day of 10th grade, or even better the first day of summer before 10th grade.
    * Demand that – per state law – everyone 16 years old with a learner's permit be allowed to use Lime e-scooters.
  • Four Car Washes Near 80 & Mace?

    Car wash center sign

    Poorly-Photoshop'd modification of "Davis Auto Center" sign on Chiles next to I-80

    I have been engaged for a couple of weeks on the subject of the proposed car wash at 480 Mace (at Cowell Blvd.), and have written about it.

    I am not sure when the following items appeared on the City's website, but I see now that there's also a plan for a "new service station, a convenience store and carwash, a separate retail building, and related site improvements" at 4810 Chiles AND to "maintain the existing carwash [and] construct a new 2,832 square-foot convenience store" and implement related features at 4480 Chiles, which already has a car wash.

    My concerns are:

    1) The public notification and project documents for the 480 Mace proposal make no mention of the simultaneous process for 4810 Chiles, for which Mr Njoku says he's aiming a hearing on March 23, 2022, though I believe Sherri Metzger said at the PC meeting tonight that this was not guaranteed – nor for 4480 Chiles, which Mr Lee says will have a hearing "soon". This is two weeks after the re-scheduled Planning Commission hearing for 480 Mace. What's the CEQA comments deadline for 4810 Chiles? The sum of this seems to be that perhaps a week before the re-rescheduled Planning Commission hearing on 480 Mace, the residents of 4735 Cowell Blvd who received the 500 ft notice that proposed car wash will receive another for the second car wash at 4810 Chiles, as will other commercial addresses within the 500 ft radius BUT significantly also the Ellington Apartments, which have their main entrance on El Cemonte, and a small shared border with 4810 Chiles. Is the 4810 Chiles applicant going to be making the same mistake as 480's in regards to a lack of outreach. (The letter about the requested continuance from the 480 Mace applicant which was shown at the PC meeting tonight thanked Staff for circulating the announcement and mentioned they were doing similar on NextDoor. Nothing else.

    Car wash plan mapOn the left the two existing car washes; on the right two proposed.

    Note that proposed ones are directly adjacent.

    2) The Traffic Studies for 480 Mace and 4810 Chiles make no mention of each other. I had already written about my concerns for the overlap for design and signalling changes for 480 Mace proposed mitigations and the Mace Re-Design non-approved plans, and this makes me even more curious.

    3) The Traffic Study for 4810 Chiles seems to show egress from NB Mace, but it's not clear if it's open, one-way etc. The Study mentions no mitigations for it.

    4) The available documents for 4810 Chiles include maps which marginally at best show El Macero Village and Ellington as "Apartments", not e.g. perhaps 500 people or more within 500 ft.

    5) The documentation for 480 refers to the proposed buildings having visual elements similar to those nearby, but this is not inclusive of what's proposed for 4810 Chiles, which looks objectively remarkably different (and subjectively incredibly generic and ugly.)

    Circle K

    Proposal for 4810 Chiles… yeah, ugh…

    6) I understand the current zoning, the district plan already referred to by Staff as "out of date", but don't see how it makes sense to have a total of four car washes in close proximity to each other (three mentioned and the one behind the Chevron station at Mace and 2nd St.) and why it's been encourage or allowed to be pursued. Given the very close timing of 480 Mace and 4810 Chiles including the lack of time and effort for community input for 480 Mace, it also seems like a race. Perhaps the Planning Commission won't approve them but what if it does, because…

    7) Two of the proposed car washes are so close that their vacuums – or loud stereos played by customers – may be able to be heard by visitors to the other location, and more critically by the apartment complex that lies partially directly in between them, El Macero Village Apartments, where I live, except during the times that the sound of I-80 is louder, but then this all has at least a subjective cumulative effect.

    8) Fehr & Peers has done the Traffic Studies for both 480 Mace and 4810 Chiles, and also the design plans for the Mace Re-Design. For the former two they are working for the applicants and for the latter for the City (and County?). It's not clear if their work for the City for the Re-Design of Mace has been used for 480 – or also 4810 Chiles – but it seems so as in the Study for 480 they suggest mitigations for areas – namely, the intersection of Mace and Cowell – for which they've also proposed concrete design modifications at the direction of the City. Is this all perfectly normal?

  • Not the Road to Not Waste Water

    Poor Outreach, Questionable Process, Certain Traffic Risk, Likely Noise, Unlikely to Meet Shading Goals, Possible Toxic Micro-particulates… Do Plans to Recycle Water Make this Car Wash Acceptable?

     

    Wide view of proposed car wash

    Curious visualization provided by the applicant: Less than 50% shading of non-planted areas, with some trees not appropriate for Davis, no dirty or clean cars… and one person riding a bike on the sidewalk.

     

    The Planning Commission is holding a hearing scheduled for March 9, 2022 on the proposed Express Car wash at 480 Mace (at Cowell Blvd), and on this date it will presumably vote on recommendations for the project, which will be brought to the Council at an unspecified later date. See the above link for information about a community meeting on February 24 — The public comment period ends today.

    In my view there have been mistakes in outreach and process, and there are likely multiple negative impacts – mostly due to traffic and noise – of the proposed business at THIS location, only some which have been addressed – or mentioned at all – in the available documentation.

    A significant amount of the documentation is on the subject of how the facility will re-cycle water. It's not clear why the self-identified eco-friendly City of Davis doesn't already require this of all similar facilities, nor why the project applicant was not encouraged to – or on their own – partner with one of the existing facilities less than a few minutes away – to allow an update for water-saving and the newer-style hybrid full- and self-serve car wash proposed for this site.

    I've made a list of issues below to make this easier to digest, and for me to focus upon! Perhaps only some of these things bother you, perhaps some you've not considered….

    I live at the other side of the apartment complex next door and have no financial interest whatsoever in this location nor this type of business.

     

    Communication, Outreach, Process

    + Their documents from December promised "community outreach", yet they didn't organize it until after people complained following an article in the Davis Enterprise and a public notice sent out in early February to addresses within 500 ft of the proposed project site.

    + They did no outreach to the Pioneer Elementary School community until one was scheduled due to community pressure. It's not clear how this community has been notified about the sole meeting.

    + They've done no specific outreach to residents especially on the west side of El Macero Village next door, where at least six units are in line of sight to and close to 14 industrial vacuums that will start to be used seven days a week, and from 7AM to 7PM in the summer.

     

    NooutreachMOD

    A promise but nothing except under pressure – From the City of Davis website, and on there from last year (if you knew where to look) and in advance of the setting of the date hearing in the Planning Commission.

    + This was not brought to the Bicycling, Transportation and Street Safety Commission, which actually looked at the Mace Re-Design a week after the public notice about this was sent out.

    + It was not brought to the Natural Resources Commission, which would make sense to me due to its noise and even potentially positive water impacts, assuming people stop using another facility or don't wash their vehicle at home.

    + It was not brought before the Tree Commission. Though there's little being done to remove existing trees, developers do obligations for a certain amt of tree cover within a certain number of years.

     

    NotconnectedwithMaceMessMOD

    On February 7, 2022 Planning Staff told me " Mace Corridor Project is a separate process. This project is not directly related and will not conflict with Mace Boulevard modifications. I assume you are familiar with what is happening and know about the Feb 10 BTSSC meeting when they are scheduled to discuss the corridor.

     

    Traffic Risks

    + The Traffic Study suggests mitigations within the geographical scope of the Mace Re-Design project, with a final design the Council will vote on in March, before they've had a hearing on the proposed car wash.The proposed mitigations affect the same built features and signalization equipment. Is the intention that Planning Commission will recommend changes that the Council will decide in the scope of the Mace Project, before they decide again on the same elements at the car wash hearing?

    + The Traffic Study makes no mention of the driveway of El Macero Village, which is perhaps less than 50 feet from the proposed Cowell Blvd driveway for the car wash.

    + The Study proposes multiple mitigations for traffic impacts including a left turn pocket into the car wash from EB Cowell, which is in the footprint of the current EB driving path into the El Macero Village driveway.

     

    TrafficMOD1

    Paths used related to the project if there are no physical modifications that prevent movements. RED is motor vehicle movements, Blue is people riding bicycles, Green is people walking. Note that movements to and from the area at the right (east), El Macero Village, were not part of the Traffic Study.

     

     

    + The Study proposes mitigations solved by staff guiding customers, signage and some hard features (which physically-restrict turn movements, etc), u-turn allowances and so, all at an already busy intersection along a Safe Route to School for children from west of Mace who attend Pioneer ES, and including a bus stop for two NB Unitrans lines. Though there seems to be significant storage space inside for vehicles to queue waiting for a wash, an overflow will go into Mace, just north of the bus stop, and along a Class II bicycle facility.

    + A local tree expert has already spoken in Council that he doubts the tree coverage plans, e.g. the visuals show shading on areas besides concrete, when only the concrete, asphalt etc counts.

    NoSetBackNoTreeCover

    Heat Island? Facing South towards Cowell Blvd.

     

    + My research has shown that the industrial vacuums typically used for self-service at car washes don't have HEPA filters. It's not clear if micro-particulates from vehicle cleaning will affect nearby areas, e.g. the apartments nearby. This issue is not mentioned in the project documentation.

    + Planning Department Staff told me that the South Davis Specific Plan is "out of date" yet "not formally rescinded". The links he sent me were from 1987 and earlier. Though a car wash is allowed, lots of other things are also allowed. See here,

    NoSetBackDetail

    Out of Code? The Davis Municipal Code requires a 25 ft set back, but in the plan – the dotted area is the eastern limit of the property – the residential district is about 15 ft from the structure. See http://qcode.us/codes/davis/view.php?topic=40-40_16-40_16_050&frames=on

    + El Macero Village, next door, is very close to I-80. Units have modernized windows, but it's very noisy it they're open. People living nearby already have this burden to deal with. There's no car wash in Davis which has multiple self-service vacuum cleaner stations located so close to so many residences, and open so early AND late. (The only roughly comparable site is Cable Car, but it opens an hour or two later and closes an hour or two earlier, depending on the season. It doesn't have 14 vacuum units, let alone 21 in total like the proposed car wash.)

    + In many places in California it's not legal to wash a vehicle in front of one's house, and in Davis only  due to the drought do we have the minimal required mitigation of a nozzle on every hose. I recall using a car wash in San Francisco in the 1990's, and pretty sure that at the time all car washes had to recycle water. Why is "Eco-Davis" so far behind in this aspect?

    + Presumably the applicant has a business case, and this "pencils out" for them and any investors. But is this accessing an untapped market (people that never wash their cars or do it at home) or will it serve people who currently use facilities elsewhere in town or nearby? If the latter, is it helping reduce lines and waits at these places, or just taking business away? Has there been a detailed study on this? It's great to have a car wash that recycles water – and I have a car, too, which I like to keep clean – but this location simply presents too many challenges and risks in noise and traffic safety and environmental degradation.

    IMG_20220214_141807(1)

    This is a view from the entrance area at the second story apartments to the east of the project. The applicant produced no visualizations from this point of view. The proposed wall of seven feet in height will be just a little taller than the bushes next to the fence. It's likely that some of the vacuum bays will be in view of the apartment windows, which are closer and have a different angle than this view.

    I always prefer a locally-owned business when I have the choice. It's not relevant to me if they're successful immigrants and new to the region or country or have been in town for a long time, and that's not something that the Planning Commission should find particularly relevant.

     

    Zoning (and more about process…)

    The area has changed a lot since 1987, it's way more built up, and Mace is now seen by many tens of thousands of people as a legit bypass of I-80, and it's not clear what the Re-Re-design will change. The proposed site is immediately next to a residential site – and from what I see the proposed set back is too short, it's about 15 ft from a structure on the east side of the lot to the residential property line – and we know a lot more about negatives of sound then we did decades ago, though the applicant says it will be just at legal limits at peaks (stereos of customers mentioned in a discussion on NextDoor were not taken into account). So just the fact that this is an industrial site right next to a residential one makes it somewhat unique, and of course wealthy people in town and City Council members don't live next door, and on top of that, the aforementioned specific conditions tell me that a lot more communication from the City and from the applicant should have been done, rather a single meeting scheduled only after people wrote the City with comments.

    Perhaps it needs to be re-zoned. The world has changed since the early 1980's when zoning was sorted out for this location. Possibly for housing. New housing could have considerable mitigation for noise, with special windows, building materials and dense greenery Without any parking, which would just be a waste of space, and expensive to build underground, and to make up for not building it higher than 35 ft. The lot is roughly half the size of the lot next door, which has over 100 two and three-bedroom apartments, but also considerable space used for parking, green space and recreation areas. So perhaps up to 50 one to three bdrm apartments with a central atrium.

     

    In Conclusion…

    Formal problems such as an improperly limited traffic study, the over-lapping approval situation with the Mace Re-design, an apparently not enthusiastic position on community outreach, especially to most relevant elementary school, the unclear outcome of the Mace project (besides the formal overlap) and sensitivity of the area, perhaps newly realized, due to the shooting incident and collision in the past couple of weeks, tells me that we should all thank the applicant for trying to make a better car wash and create a few well-paying jobs with good insurance benefits, but to do it in another location — perhaps working with one of the current car washes not so far away to convert it to this more modern type.

     

  • Bike Parking is Complicated?

    YoloBypassDRAFT

     
    Using a battery-powered common angle grinder, Darell Dickey works with the Davis Police Department to cut locks from abandoned bikes found in the city. He knows first hand that the soft metal of the Lightning Bolt racks is often easier to cut than the locks themselves. ROAM's creators claim that the lock takes 2500% more time to cut than a – presumably typical – U-lock. If ROAM eventually provides full coverage in Davis and UC Davis – note that there is no plan to equip racks on private property – and people really want a bike, won't they simply take a predictably short amount of time to cut the city racks?  (Inset photo from ROAM brochure attacked to Staff Report. Right hand photo taken in Davis in Fall 2017.)

     

    Tomorrow on UC Davis campus and at the monthly meeting of the Bicycling, Transportation and Street Safety Commission (BTSSC) a new shared public bicycle lock will be introduced, followed by pilots and local research…

    I'VE not seen the lock in use and the presentation doesn't contains imagery that's clearly actual photography – and not the much more helpful video – but for now have comments and questions for the lock developers, City and UCD partners….

    • The BTSSC and other complementary bodies have not created a new strategy for bicycle security, have not asked to do so, and have not been asked to do so.
    • City of Davis Staff are implementing new programs using City property without Council approval.
    • The locking system seems over-complicated, dependent on smart phones, Cloud-connectivity and electrical power supply (both on the locks and system servers) to function properly, or at all.
    • It’s not clear that the City and UC Davis c
      Roam1

      From ROAM's brochure, attached to the Staff Report

      ampus will end up having the same program, or if one body might accept it and the other not. (Despite the reality of the City-Campus Mobility District, transportation engineering and planning, organization and promotional activities and infrastructure standards of the City and Campus are mostly formally separate aside from cooperation on, for example, Unitrans and the Reimagine Russell visioning project. There's a plan to allow shared e-scooters on campus but not in the city — a big mistake in user-friendly transportation policy.)

    • The promises of resistance to defeat and plans for distribution seem exaggerated, and it’s possible that the City would have to pay for it despite being instrumental in development of a commercial product. If the project goes forward, its users in Davis should not have to pay for the system though user fees, or indirectly. The City is looking into this, but it's not clear if the ROAM creators will take responsibility for it, or other sources will be sought.
    • The system does not work with non-Lightning Bolt (LB) racks (unless there’s a variant for other modern types).
    • Aside from the system used on UCD campus, it’s only for racks on City property, this leaves out a tremendous number of LB-equipped parking spaces, many of which present significant opportunity for theft due to lack of supervision or supplemental security (e.g. bicycle rooms). It’s important to note all of these properties are in fact semi-public and still required to observe local regulations for bicycle storage.
    • It’s not clear if the system will actually be available on semi-public property. In some cases this will mean that ROAM-equipped and non-equipped racks will be in close proximity. This seems to be a direct contradiction of the “everyone” claims of the concept’s authors.
    • If the system IS available for use on semi-public property but only via opt-in, i.e. by choice of the property’s managers or owners, it may further widen the gulf between the haves and have nots in bicycle parking in Davis, as there are a significant number of (improvised) parking spaces at commercial properties and residences which have no racks, LB or otherwise. This is in direct contradiction of the authors' claimed benefits and violates equity principles for Davis as lower quality bicycle-parking is likely over-represented at more modest rental properties (This would be solved starting with a truly-equitable policy of the City, initiated by the Council and discussed and prepared for actualization by recommendation of relevant Commissions, e.g. the BTSSC and Social Services.) There's also no explicit mention of DJUSD properties – i.e. users such as students at primary and secondary schools, even as a future goal (yes, inclusive of the magic "everyone"). Bicycle theft on these campuses is a huge problem that the administration is not solving. The theft of  a bicycle can be traumatic for people in this age group, especially if their family has difficulty replacing it. Why isn't this community involved at the first stage? Isn't there considerable value in the user experience of a younger person who might have difficulty with some over-complicated systems?
    • City Staff promised new bicycle parking regulations as long as two years ago, but nothing has come of it (only the registration program which is mostly the work of an outside entity, and ROAM). Five years ago, the City initiated a plan to improve bicycle parking at Davis Depot, and eventually added longer lockers, which fit the long-tail type of cargo bicycle. Five years ago the City declined to pursue acquiring facilities that would accommodate larger cargo bikes or bikes with  trailers for Davis Depot. Prior to the pandemic there were some ideas about adding over-sized bicycle parking in the one of the under-utilized buildings at the Depot, but nothing's come of it.

     

    273615950_1541649452881847_7777620194860680555_n

    There's secure parking for this vehicle at the train station… (Image: Urban Cycling Institute on Facebook)
    Bike-Europe-Pon-Takesover-Urban-Arrow-1024x695

    … but not this one (Image: Urban Arrow)

    The Bike Lock design:

    What makes it take “25 times” more time to breach than…. what? A cable lock, a top-of-the-line U lock? My chain and lock combo takes at least 3 to 4 minutes to cut in the field with an angle grinder  – ROAM takes 90 minutes?

    It’s “Cloud Connected”: What happens when it can’t connect for any number of reasons, as other systems can’t sometimes? Does it become unusable?

    Right now the “Lightning Bolt” locks take less time to cut than the more expensive hardened locks. The main reason it’s not happened a lot is likely due to the psychological disincentive of damaging city or university property, as opposed to personal property. Will existing racks be modified to be more resistant to quick cutting?

    Presumably the alarm sound comes from a small hole etc that’s also protected from water intrusion – have their been tests to seal this without setting off the alarm?

    If the QR code on the lock is damaged how can the user disable the lock?

    If the user loses their phone or its battery is dead, how the can the user disable the lock?

    How many regular bicycle users don’t have mobile phones?

    Is there a way for people who don’t have mobile phones to use the system?

    What supplies the power to the locks? A separate battery on each holding piece that requires a swap for a recharged battery? How often does it need to be recharged?

    Have there been tests where a unit’s alarm and lights were activated in the present of people not connected with the project? If so, what was their reaction?

    All the visuals in the attached promotional brochure are visualizations – no photos. Presumably some exist as they are being introduced BEFORE the BTSSC meeting and before its members formally-reviewed it. 

    *****

    I went through the entire staff report and interleaved comments and questions. It's long and it's here.