Davisite Banner. Left side the bicycle obelisk at 3rd and University. Right side the trellis at the entrance to the Arboretum.

Category: Housing

  • Letter: Where’s the Water? NO on H!

    Measure H is a rare opportunity for us, as individuals, to choose what is good for the many over what is good for the few.  The NO on H arguments focus on verifiable negative impacts of the proposed DISC development such as increased traffic and paving over of prime agricultural land, while the Yes side claims that, if all goes as advertised, the city will benefit financially.

    No matter which arguments you believe or favor, there is one overarching reason to vote NO on H – WATER.  The City of Davis, indeed the entire state, is in the throes of a severe, worsening drought.   Davis receives surface water from the Sacramento River and well(or ground-)water pumped from aquifers beneath the city.  Our surface water supply is limited by finite, maximum water “rights,” which in turn are dependent on upstream reservoir levels and snowpack, both of which are far below normal, and pumping huge volumes of water, especially from the deep aquifers, is unsustainable. 

    The agricultural land on which DISC would be built currently receives NO water from the city of Davis – NONE.  And, as ag land, it can be fallowed if necessary.  BUT, if Measure H passes, that 100-plus acres of land will be annexed into the City and connected – permanently – to our city water infrastructure, thus creating a new drain on our already-limited water supply.  And, if water is like any other commodity, even as we conserve more as a community, the demands of DISC and already-approved projects will lead to increased water rates.

    But fear not, our city leaders have not forgotten us.  Even as they are campaigning for Measure H, they are planning to educate us with a new “messaging” slogan: “No doubt, We’re in a Drought!”  

    Seriously folks, a few people could make a pile of money if H passes, and the City might benefit financially, but I believe we need to help the many by voting NO on Measure H.

    Rick Entrikin
    Davis

  • Letter: Not buying DiSC

    I knew this Yes on H campaign was off to an ignominious start when I started receiving phone calls.  A lot of phone calls. All seeking my opinion.  Developers care about my thoughts? Not likely.  When you get THAT many phone calls, you know the pockets pushing a project are deep, aggressive, and expect to make a lot of money. They don’t like anyone getting in their way.  Then a sitting city Davis city council member, who heads the Yes on H campaign, sued the opposition with the apparent intent of snuffing out dissenting voices.  This lawsuit against the No on H folks felt Trump inspired: sic lawyers on any opposition and financially drain them into submission. That’ll teach ’em to speak up!

    The Yes on H folks are trying to create the illusion that this enormous industrial development will attract people seeking nature.  This project is simultaneously being billed as helping solve the housing crisis in Davis (it won’t), helping endangered species (by paving almost 100 of acres of land, I guess) and solving climate change (because some people may take the bus or bike out there). Their “transit plaza” is …a bus stop. See how easy solving world climate change was! All solved with a single development!  Wow.  I guess mentioning “world peace” was too much of a stretch, even for them. Maybe next time, after they’ve had their way with Davis, they’ll say that their NEXT mega development will solve the Middle East Crisis.

    When they expect over 2,500 employees working at site, yet only 460 housing units (with no guarantee that residents in the development are actually working at the site) … then … well, it’s not going to be an environmental utopia, no matter the grand the promises.  No solving the Climate Crisis.  No world peace either, I guess.

    Davis needs to vote no on this project before the project leaders shut down any more voices that they don’t like with their lawyers.

    Liz Reay 

    Davis

  • It is all there in the Numbers … Traffic, Traffic, Traffic!!!

    Traffic-on-maceBy Matt Williams

    With apologies in advance to those people who find my articles and/or comments too detailed, I’m going to clearly show David Greenwald of the Davis Vanguard the numbers, so that he, and hopefully everyone, understands the traffic study contents. 

    For those of you who want to skip the detail and just read the summary, it appears at the bottom of the article alongside the very tall Google Earth image of Mace and its current lane configuration.

    With the caveat that the readers of yesterday’s article don’t know what steps might have happened behind the scenes that weren’t described in the article, it appears that yesterday, David Greenwald forgot to follow his own advice.  Several times in the recent past David has complained bitterly that one of the Vanguard’s guest writers published their article without taking the time to check with an information source prior to publishing an article that criticizes one or more aspects of our community’s decisions and/or decision processes.  I believe, but could be wrong if there is information I don’t know about, David would have done well for himself and for the Yes On Measure H campaign team if he had checked with the information source he criticized in yesterday’s article.  If he did do so, I’m sure he will clarify in a comment.

    Traffic studies are arcane beasts.  They follow a set of clearly set out rules that a lay person like David and me has to work hard to understand. It is easy for a lay person to make mistakes when trying to understand “WHY?” a traffic finding in the traffic study is what it is.  In late 2020 when formally submitting questions  about the traffic study in the Draft EIR, I learned that lesson the hard way.  To their credit Fehr & Peers responded very clearly, logically, understandably, and professionally to my questions … pointing out where I had gone wrong in my calculations.  They were good teachers.  I thank them for that educational lesson.

    So, when the updated traffic study for DiSC 2022 was published I was able to much better understand the data … and also carry forward the intersection by intersection graphics that had accompanied the 2020 traffic study.  However, before I finalized any conclusions based on the new data, I reviewed those tentative conclusions with a retired City traffic engineer and two engineering professionals who have considerable experience dealing with traffic.  Their collective and individual counsel was very valuable.  Their advice would have been very helpful to David if he had sought that advice prior to publishing yesterday.

    (more…)

  • Misrepresentations of the Yes on H/Yes on DiSC campaign

    Yes-on-H-mailer-cropped-annotatedBy Colin Walsh

    The Vanguard published a guest commentary by Jackson Mills, “Debunking Deceptive Descriptions of DiSC in No on H Campaign Messaging,” on Tuesday morning. But it’s the commentary itself that is deceptive.

    Ironically Mr. Mills himself chooses to mislead people in his selection of an outdated illustration to lead the article. It is notable that the illustration used with this article is from the previous DISC proposal and is certainly not an accurate picture of the current DiSC proposal. The water feature in this picture is an idealized version of the drainage ditch that ran through the middle of the previous project (it also shows far more water than there ever would have been). The drainage ditch does not run through the project in the current iteration. And the drainage ditch certainly doesn’t support paddle boarding as depicted on the Yes on H mailers.

    The Vanguard has done nothing to address the Misrepresentations of the Yes on H campaign. Those claims have included such outrageous exaggerations and misinformation such as:

    Measure H “helps our community fight the housing crisis” – DiSC will have over 2,400 employees, and by the City’s own documents only 187 will live in the onsite housing. That adds over 2,200 additional people looking for housing in Davis, adding pressure to our already incredibly tight Davis housing market.

    (more…)

  • Affordable Housing Expert argues that Affordable Housing at DiSC does not Comply with City of Davis Municipal Code

    Landplan

    Site map showing the Residential Area of DiSC adjacent to the Advanced Manufacturing Area. Most of the residential units will be market rate, not Affordable.

    By Matt Williams

    Each morning for the next two weeks I will provide Davisite readers and Davis voters with an article on one of the dozen issues that I covered in my presentation on Thursday at University Retirement Community which had Dan Carson presenting for Yes On Measure H.  For everyone’s reference, at the end of this article I have listed those dozen issues that argue strongly for a “No” vote on Measure H.

    What is the most important reason to vote “No” on Measure H?

    On Tuesday I got a telephone call from David Thompson, the president of he Twin Pines Cooperative Foundation and co-principal of Neighborhood Partners LLC, which has developed and has in development over 1,400 units of low-income integrated nonprofit housing valued at over $200 million. His Affordable Housing projects in Davis include:

    Creekside
    Eleanor Roosevelt Circle
    Cesar Chavez Plaza
    Tremont Green
    Moore Village
    Twin Pines
    Owendale
    Dos Pinos

    David has forgotten more about Affordable Housing than I will ever know. So when he asked me if I was interested in understanding how there is considerably less Affordable Housing in the DiSC project than is required by the City of Davis Affordable Housing Ordinance, I was quick to listen.

    (more…)

  • Fact Checking Matt Williams’s Affordable Housing article

    By Matt Williams

    This table provides fact checking for the article Affordable Housing Expert argues that Affordable Housing at DiSC does not Comply with City of Davis Municipal Code

    What is the most important reason to vote “No” on Measure H?

    A header

    On Tuesday I got a telephone call from David Thompson, the president of the Twin Pines Cooperative Foundation and co-principal of Neighborhood Partners LLC, which has developed and has in development over 1,400 units of low-income integrated nonprofit housing valued at over $200 million. His Affordable Housing projects in Davis include:

    Creekside
    Eleanor Roosevelt Circle
    Cesar Chavez Plaza
    Tremont Green
    Moore Village
    Twin Pines
    Owendale
    Dos Pinos

    Factually correct

    David has forgotten more about Affordable Housing than I will ever know. So when he asked me if I was interested in understanding how there is considerably less Affordable Housing in the DiSC project than is required by the City of Davis Affordable Housing Ordinance, I was quick to listen.

    Factually correct

    David started our discussion by asking me whether I had received the recent promotion piece for Yes on Measure H, which says, “Measure H enhances and advances more of what we love about Davis by creating affordable housing.”

    Factually correct … confirmable on the Yes on DiSC website

    After I told him that I had indeed seen that statement, he replied “That statement by DiSC is simply not true!”

    DISC is purposefully choosing to provide less affordable housing as a percentage of the total than any previously proposed site that has come up for a citizen vote.

    Factually correct.  He absolutely shared that opinion with me.

    The reason is both simple and straightforward. Prior to 2018 all citizen vote proposals provided at least 25-35% of the housing units as permanently affordable under the provisions of Article 18.05 of the City of Davis Municipal Code … the City of Davis Affordable Housing Ordinance … which states.

    Factually correct.

    To the maximum extent feasible, each developer must meet the ownership affordable unit requirement as it pertains to the project, as set forth below:

    (a) Standard ownership affordable housing requirements. Any development that is comprised in whole or in part of ownership units shall comply with the following requirements, which shall be included in the development’s affordable housing plan.

    (1) Affordable Housing Requirements, by Residential Product Type.

    (A) For projects comprised of market rate single-family detached ownership units on lots larger than five thousand square feet in area, the developer must provide for a number of affordable housing units equivalent to twenty-five percent of the total units being developed, including the affordable units, by means of one of the methods set forth in this section.

    […]

    General plan implementing policies also require that, to the extent feasible and subject to existing law, rental housing developments with five to nineteen units shall provide fifteen percent of the units to low income households and ten percent to very low income households; and in rental housing developments with twenty or more units that twenty-five percent of the units be affordable to low income households and ten percent of the units be affordable to very low income households. General plan policies also require that affordable rental units remain affordable in perpetuity. (Ord. 2418 § 1, 2013)

    Factually correct.  Every word is copied verbatim and pasted directly from the Municipal Code

    David went on to explain that DISC is applying under the “Interim Affordable Housing Ordinance” which substantially reduced the requirement to 15%.

    Factually correct

    The interim Affordable Housing Ordinance was passed by City Council in February 2018 with the stated plan that it would sunset on December 31, 2018. That sunset never happened, and its interim policy is still in effect.

    Factually correct.  The Vanguard has published that very information in past articles.

    However, that interim policy with its lowered 15% was written specifically to apply to land already in the city, and was/is based on the December 11, 2015 Economic Report prepared for the City by A Plescia & Co entitled Preliminary Project Economic Analysis For City of Davis Affordable Housing Ordinance.  That Plescia report begins as follows:

    Factually correct.

    The primary purpose of this summary report is to present preliminary information related to the projected economic implications of potential affordable housing ordinance requirements on certain urban scale residential ownership and rental development prototypes. The project economic analysis summarized in this report addresses the estimated financial feasibility (including profitability) information for certain identified residential ownership and rental development prototypes.

    Factually correct.  Every word is copied verbatim and pasted directly from the Plesia Report document

    The preliminary project economic information presented in this report can be used by the City of Davis to inform the process being undertaken by the City of Davis in regard to its consideration of amending its existing Affordable Housing Ordinance as it relates to the identified residential ownership and rental development prototypes addressed in this memorandum.

    […]

    For purposes of this preliminary project economic analysis, the identified residential and mixed-use prototype alternatives are assumed to each be developed on a hypothetical 2.0 acre infill development site within the current urbanized area of the City of Davis.

    Factually correct.  Every word is copied verbatim and pasted directly from the Plesia Report document

    Why within the current urbanized area of the City?

    Header

    Because land costs in the City had risen to the level of  hundreds of thousands of dollars per acre.

    There probably were a number of reasons, but this is the root cause reason.  So this statement can be characterized as an opinion rather than a fact.

    Land that is outside the urbanized area, like the DISC site, does not suffer from high land costs. It resides on agricultural land outside the City Limits that was purchased for considerably less than $10,000 per acre … NOT hundreds of thousands of dollars per acre.

    Factually correct

    That economic reality, and the clear words of the Plescia report mean the affordable housing requirement for DiSC should remain at the 25-35% threshold contained in Article 18.05 of the Municipal Code

    Opinion / Conclusion / Position

    In November 2019 hundreds of Davis residents applauded Richard Rothstein’s talk on the “Color of Law,” which critiqued the role of government in reducing housing for people of color. Many of us want a future Davis to be more inclusive and expansive of housing for low income residents and racial minorities.

    Factually correct

    DISC does the opposite by providing considerably less housing for low income residents and racial minorities.

    Opinion / Conclusion / Position

    David is unequivocal in his opinion that the interim Affordable Housing Ordinance simply does not apply to DiSC, and until and unless the DiSC project changes its Affordable Housing Plan to comply with the provisions Article 18.05 of the City of Davis Municipal Code, the only choice is to vote “NO” on Measure H.  David Thompson has clearly stated that it is the most important reason to vote “No.”  None of us should want to live in a Davis that accepts fewer homes for those most in need and people of color.

    Opinion / Conclusion / Position plus a recommendation for solving the problem identified.

    As noted at the beginning of this article, each morning for the next two weeks I will provide Vanguard readers and Davis voters with an article on one of the dozen issues listed below that I covered in my presentation on Thursday at University Retirement Community.

    Reasons to Vote “NO” on Measure H

    • Massive Traffic Problems
    • No Firm Plans to Mitigate Traffic
    • Unmitigated Greenhouse Gas Emissions
    • DISC will Cannibalize Existing Downtown and Local Businesses in Davis that are Still Hurting from the Pandemic
    • Projected Financial Projections to the City are Questionable or Misleading
    • We Cannot Trust our City Staff and Council to Protect Us from Rapacious and Predatory Developers
    • Critical Farmland, Habitat, and our Last Views of the Sierra and Sacramento Skyline will be Lost Forever
    • A Yes Vote Gives the Developer Lucrative Entitlements with No Guaranteed Baseline Features in Many Critical Areas
    • The Project Will Exacerbate the Housing Shortage in the Davis Area
    • The Scale of the DiSC Business Park is Much Too Large for a Small College Town Like Davis
    • An industrial-research development while we are in a serious drought?

    N/A

  • Letter: 2 reasons for voting No on H: Muzzling citizens & exclusionary housing

    Thompson graphic 2Dear Davis Citizens:

    Two reasons for voting No on H.

    Council Member Carson tried to silence six voices opposed to Measure H. The six Davis citizens incurred a $71,000 bill to defend themselves, and now Carson is suing them for his legal costs of $76,358. Those volunteer voices are potentially paying $147,000+ from their personal savings.

    On the other hand Carson has incurred no personal costs because his attempt to muzzle citizen voices opposed to Measure H was financed by the DISC developer.

    That has prompted me to raise my own citizen voice … Council member Carson’s developer-funded stealth tactic should not be rewarded!  That alone is reason enough to vote No on Measure H.

    However, there is a second reason to vote No on H. There’s Less Affordable Housing than the norm!

    I received a Measure H piece, stating,

    Measure H enhances and advances more of what we love about Davis, Affordable Housing.

    Simply not true. DISC is providing less affordable housing as a % than any site set for a citizen vote.

    Prior to 2018 all citizen vote proposals provided at least 25-35% of the housing units as permanently affordable. DISC is applying under the “Interim Affordable Housing Ordinance” which substantially reduced the requirement to 15%.

    However, the interim policy with its lowered 15% was written specifically to apply to land already in the city.  Why?  Because land costs in the City are hundreds of thousands of dollars per acre.

    The DISC site does not suffer from high land costs.  It resides on agricultural land outside of the city that was purchased for likely less than $10,000 per acre.  Therefore, the affordable housing requirement should remain at 25-35%.

    In November 2019 hundreds of Davis residents applauded Richard Rothstein’s talk on the “Color of Law,” which critiqued the role of government in reducing housing for people of color. Many of us want a future Davis to be more inclusive and expansive of housing for low income residents and racial minorities.

    DISC does the opposite by providing considerably less housing for low income residents and racial minorities.

    Please join me in voting No on H.

    David J Thompson
    Davis

  • Old East Davis Requests Review of the Trackside Project Appellate Decision

    Mandala-oednaThe Old East Davis Neighborhood Association (OEDNA) is requesting review by the California Supreme Court of the recent appellate court decision on the Trackside development project, in the case of OEDNA vs. City of Davis.

    We are doing this because we believe that the City should be faithful to the plain meaning of its planning and zoning rules, and because we want to preserve the setting and feeling of our historic neighborhood.

    By convention, land use policies adopted by a California city can be interpreted by the same city when the policies are applied to specific projects. While this sounds logicalgiving cities flexibility and local controlif understood too broadly, the conventional view could allow a city to reinterpret planning policies in ways that violate their original meaning and intent.

    In the Trackside case, the Yolo Superior Court found that the City of Davis overstepped its discretion in approving the project, which does not conform to the City’s land use policies for mass and scale transitions between the downtown core and traditional neighborhoods.

    To our dismay, the appeals court reversed the Yolo court’s decision, and in doing so claimed that the City has almost unlimited discretion in the application of its planning policies.

    (more…)

  • Promises Made…Promises Broken!

    Broken promisesHow Ongoing Complacency by the Davis City Council Allowed the Bretton Woods Developer to Renege on Many Election Commitments Made to the Voters of Davis

    Part 1– A Specious Lawsuit by the Bretton Woods Developer, David Taormino as agent for the Binning Ranch Company LLC,  Forces the University Retirement Community (URC) to Abandon Plans to Construct an Enhanced Memory Care Facility at the Project Site. The Developer Proposes to Alternatively Construct 30 Detached Senior Homes which Seemingly Violates the Supposedly Immutable Voter-Approved Baseline Features of the Project but Which Could Result in Millions Dollars of Additional Profits to the Developer.

    By Alan Pryor

    Introduction

    This is Part 1 of a planned series of articles discussing how the City Council is approving entitlements for the Bretton Woods project that violate the project's supposedly unchangeable Baseline Features. These Baseline Features were contained in ballot language presented to voters and upon which the voters relied when the project was approved at the polls in November 2018. The approved entitlements also completely change key provisions of Development Agreement between the Developer and the City that was also very prominently presented to the public prior to the vote.

    (more…)

  • Not the Road to Not Waste Water

    Poor Outreach, Questionable Process, Certain Traffic Risk, Likely Noise, Unlikely to Meet Shading Goals, Possible Toxic Micro-particulates… Do Plans to Recycle Water Make this Car Wash Acceptable?

     

    Wide view of proposed car wash

    Curious visualization provided by the applicant: Less than 50% shading of non-planted areas, with some trees not appropriate for Davis, no dirty or clean cars… and one person riding a bike on the sidewalk.

     

    The Planning Commission is holding a hearing scheduled for March 9, 2022 on the proposed Express Car wash at 480 Mace (at Cowell Blvd), and on this date it will presumably vote on recommendations for the project, which will be brought to the Council at an unspecified later date. See the above link for information about a community meeting on February 24 — The public comment period ends today.

    In my view there have been mistakes in outreach and process, and there are likely multiple negative impacts – mostly due to traffic and noise – of the proposed business at THIS location, only some which have been addressed – or mentioned at all – in the available documentation.

    A significant amount of the documentation is on the subject of how the facility will re-cycle water. It's not clear why the self-identified eco-friendly City of Davis doesn't already require this of all similar facilities, nor why the project applicant was not encouraged to – or on their own – partner with one of the existing facilities less than a few minutes away – to allow an update for water-saving and the newer-style hybrid full- and self-serve car wash proposed for this site.

    I've made a list of issues below to make this easier to digest, and for me to focus upon! Perhaps only some of these things bother you, perhaps some you've not considered….

    I live at the other side of the apartment complex next door and have no financial interest whatsoever in this location nor this type of business.

     

    Communication, Outreach, Process

    + Their documents from December promised "community outreach", yet they didn't organize it until after people complained following an article in the Davis Enterprise and a public notice sent out in early February to addresses within 500 ft of the proposed project site.

    + They did no outreach to the Pioneer Elementary School community until one was scheduled due to community pressure. It's not clear how this community has been notified about the sole meeting.

    + They've done no specific outreach to residents especially on the west side of El Macero Village next door, where at least six units are in line of sight to and close to 14 industrial vacuums that will start to be used seven days a week, and from 7AM to 7PM in the summer.

     

    NooutreachMOD

    A promise but nothing except under pressure – From the City of Davis website, and on there from last year (if you knew where to look) and in advance of the setting of the date hearing in the Planning Commission.

    + This was not brought to the Bicycling, Transportation and Street Safety Commission, which actually looked at the Mace Re-Design a week after the public notice about this was sent out.

    + It was not brought to the Natural Resources Commission, which would make sense to me due to its noise and even potentially positive water impacts, assuming people stop using another facility or don't wash their vehicle at home.

    + It was not brought before the Tree Commission. Though there's little being done to remove existing trees, developers do obligations for a certain amt of tree cover within a certain number of years.

     

    NotconnectedwithMaceMessMOD

    On February 7, 2022 Planning Staff told me " Mace Corridor Project is a separate process. This project is not directly related and will not conflict with Mace Boulevard modifications. I assume you are familiar with what is happening and know about the Feb 10 BTSSC meeting when they are scheduled to discuss the corridor.

     

    Traffic Risks

    + The Traffic Study suggests mitigations within the geographical scope of the Mace Re-Design project, with a final design the Council will vote on in March, before they've had a hearing on the proposed car wash.The proposed mitigations affect the same built features and signalization equipment. Is the intention that Planning Commission will recommend changes that the Council will decide in the scope of the Mace Project, before they decide again on the same elements at the car wash hearing?

    + The Traffic Study makes no mention of the driveway of El Macero Village, which is perhaps less than 50 feet from the proposed Cowell Blvd driveway for the car wash.

    + The Study proposes multiple mitigations for traffic impacts including a left turn pocket into the car wash from EB Cowell, which is in the footprint of the current EB driving path into the El Macero Village driveway.

     

    TrafficMOD1

    Paths used related to the project if there are no physical modifications that prevent movements. RED is motor vehicle movements, Blue is people riding bicycles, Green is people walking. Note that movements to and from the area at the right (east), El Macero Village, were not part of the Traffic Study.

     

     

    + The Study proposes mitigations solved by staff guiding customers, signage and some hard features (which physically-restrict turn movements, etc), u-turn allowances and so, all at an already busy intersection along a Safe Route to School for children from west of Mace who attend Pioneer ES, and including a bus stop for two NB Unitrans lines. Though there seems to be significant storage space inside for vehicles to queue waiting for a wash, an overflow will go into Mace, just north of the bus stop, and along a Class II bicycle facility.

    + A local tree expert has already spoken in Council that he doubts the tree coverage plans, e.g. the visuals show shading on areas besides concrete, when only the concrete, asphalt etc counts.

    NoSetBackNoTreeCover

    Heat Island? Facing South towards Cowell Blvd.

     

    + My research has shown that the industrial vacuums typically used for self-service at car washes don't have HEPA filters. It's not clear if micro-particulates from vehicle cleaning will affect nearby areas, e.g. the apartments nearby. This issue is not mentioned in the project documentation.

    + Planning Department Staff told me that the South Davis Specific Plan is "out of date" yet "not formally rescinded". The links he sent me were from 1987 and earlier. Though a car wash is allowed, lots of other things are also allowed. See here,

    NoSetBackDetail

    Out of Code? The Davis Municipal Code requires a 25 ft set back, but in the plan – the dotted area is the eastern limit of the property – the residential district is about 15 ft from the structure. See http://qcode.us/codes/davis/view.php?topic=40-40_16-40_16_050&frames=on

    + El Macero Village, next door, is very close to I-80. Units have modernized windows, but it's very noisy it they're open. People living nearby already have this burden to deal with. There's no car wash in Davis which has multiple self-service vacuum cleaner stations located so close to so many residences, and open so early AND late. (The only roughly comparable site is Cable Car, but it opens an hour or two later and closes an hour or two earlier, depending on the season. It doesn't have 14 vacuum units, let alone 21 in total like the proposed car wash.)

    + In many places in California it's not legal to wash a vehicle in front of one's house, and in Davis only  due to the drought do we have the minimal required mitigation of a nozzle on every hose. I recall using a car wash in San Francisco in the 1990's, and pretty sure that at the time all car washes had to recycle water. Why is "Eco-Davis" so far behind in this aspect?

    + Presumably the applicant has a business case, and this "pencils out" for them and any investors. But is this accessing an untapped market (people that never wash their cars or do it at home) or will it serve people who currently use facilities elsewhere in town or nearby? If the latter, is it helping reduce lines and waits at these places, or just taking business away? Has there been a detailed study on this? It's great to have a car wash that recycles water – and I have a car, too, which I like to keep clean – but this location simply presents too many challenges and risks in noise and traffic safety and environmental degradation.

    IMG_20220214_141807(1)

    This is a view from the entrance area at the second story apartments to the east of the project. The applicant produced no visualizations from this point of view. The proposed wall of seven feet in height will be just a little taller than the bushes next to the fence. It's likely that some of the vacuum bays will be in view of the apartment windows, which are closer and have a different angle than this view.

    I always prefer a locally-owned business when I have the choice. It's not relevant to me if they're successful immigrants and new to the region or country or have been in town for a long time, and that's not something that the Planning Commission should find particularly relevant.

     

    Zoning (and more about process…)

    The area has changed a lot since 1987, it's way more built up, and Mace is now seen by many tens of thousands of people as a legit bypass of I-80, and it's not clear what the Re-Re-design will change. The proposed site is immediately next to a residential site – and from what I see the proposed set back is too short, it's about 15 ft from a structure on the east side of the lot to the residential property line – and we know a lot more about negatives of sound then we did decades ago, though the applicant says it will be just at legal limits at peaks (stereos of customers mentioned in a discussion on NextDoor were not taken into account). So just the fact that this is an industrial site right next to a residential one makes it somewhat unique, and of course wealthy people in town and City Council members don't live next door, and on top of that, the aforementioned specific conditions tell me that a lot more communication from the City and from the applicant should have been done, rather a single meeting scheduled only after people wrote the City with comments.

    Perhaps it needs to be re-zoned. The world has changed since the early 1980's when zoning was sorted out for this location. Possibly for housing. New housing could have considerable mitigation for noise, with special windows, building materials and dense greenery Without any parking, which would just be a waste of space, and expensive to build underground, and to make up for not building it higher than 35 ft. The lot is roughly half the size of the lot next door, which has over 100 two and three-bedroom apartments, but also considerable space used for parking, green space and recreation areas. So perhaps up to 50 one to three bdrm apartments with a central atrium.

     

    In Conclusion…

    Formal problems such as an improperly limited traffic study, the over-lapping approval situation with the Mace Re-design, an apparently not enthusiastic position on community outreach, especially to most relevant elementary school, the unclear outcome of the Mace project (besides the formal overlap) and sensitivity of the area, perhaps newly realized, due to the shooting incident and collision in the past couple of weeks, tells me that we should all thank the applicant for trying to make a better car wash and create a few well-paying jobs with good insurance benefits, but to do it in another location — perhaps working with one of the current car washes not so far away to convert it to this more modern type.