Category: Downtown

  • Bike Parking is Complicated?

    YoloBypassDRAFT

     
    Using a battery-powered common angle grinder, Darell Dickey works with the Davis Police Department to cut locks from abandoned bikes found in the city. He knows first hand that the soft metal of the Lightning Bolt racks is often easier to cut than the locks themselves. ROAM's creators claim that the lock takes 2500% more time to cut than a – presumably typical – U-lock. If ROAM eventually provides full coverage in Davis and UC Davis – note that there is no plan to equip racks on private property – and people really want a bike, won't they simply take a predictably short amount of time to cut the city racks?  (Inset photo from ROAM brochure attacked to Staff Report. Right hand photo taken in Davis in Fall 2017.)

     

    Tomorrow on UC Davis campus and at the monthly meeting of the Bicycling, Transportation and Street Safety Commission (BTSSC) a new shared public bicycle lock will be introduced, followed by pilots and local research…

    I'VE not seen the lock in use and the presentation doesn't contains imagery that's clearly actual photography – and not the much more helpful video – but for now have comments and questions for the lock developers, City and UCD partners….

    • The BTSSC and other complementary bodies have not created a new strategy for bicycle security, have not asked to do so, and have not been asked to do so.
    • City of Davis Staff are implementing new programs using City property without Council approval.
    • The locking system seems over-complicated, dependent on smart phones, Cloud-connectivity and electrical power supply (both on the locks and system servers) to function properly, or at all.
    • It’s not clear that the City and UC Davis c
      Roam1

      From ROAM's brochure, attached to the Staff Report

      ampus will end up having the same program, or if one body might accept it and the other not. (Despite the reality of the City-Campus Mobility District, transportation engineering and planning, organization and promotional activities and infrastructure standards of the City and Campus are mostly formally separate aside from cooperation on, for example, Unitrans and the Reimagine Russell visioning project. There's a plan to allow shared e-scooters on campus but not in the city — a big mistake in user-friendly transportation policy.)

    • The promises of resistance to defeat and plans for distribution seem exaggerated, and it’s possible that the City would have to pay for it despite being instrumental in development of a commercial product. If the project goes forward, its users in Davis should not have to pay for the system though user fees, or indirectly. The City is looking into this, but it's not clear if the ROAM creators will take responsibility for it, or other sources will be sought.
    • The system does not work with non-Lightning Bolt (LB) racks (unless there’s a variant for other modern types).
    • Aside from the system used on UCD campus, it’s only for racks on City property, this leaves out a tremendous number of LB-equipped parking spaces, many of which present significant opportunity for theft due to lack of supervision or supplemental security (e.g. bicycle rooms). It’s important to note all of these properties are in fact semi-public and still required to observe local regulations for bicycle storage.
    • It’s not clear if the system will actually be available on semi-public property. In some cases this will mean that ROAM-equipped and non-equipped racks will be in close proximity. This seems to be a direct contradiction of the “everyone” claims of the concept’s authors.
    • If the system IS available for use on semi-public property but only via opt-in, i.e. by choice of the property’s managers or owners, it may further widen the gulf between the haves and have nots in bicycle parking in Davis, as there are a significant number of (improvised) parking spaces at commercial properties and residences which have no racks, LB or otherwise. This is in direct contradiction of the authors' claimed benefits and violates equity principles for Davis as lower quality bicycle-parking is likely over-represented at more modest rental properties (This would be solved starting with a truly-equitable policy of the City, initiated by the Council and discussed and prepared for actualization by recommendation of relevant Commissions, e.g. the BTSSC and Social Services.) There's also no explicit mention of DJUSD properties – i.e. users such as students at primary and secondary schools, even as a future goal (yes, inclusive of the magic "everyone"). Bicycle theft on these campuses is a huge problem that the administration is not solving. The theft of  a bicycle can be traumatic for people in this age group, especially if their family has difficulty replacing it. Why isn't this community involved at the first stage? Isn't there considerable value in the user experience of a younger person who might have difficulty with some over-complicated systems?
    • City Staff promised new bicycle parking regulations as long as two years ago, but nothing has come of it (only the registration program which is mostly the work of an outside entity, and ROAM). Five years ago, the City initiated a plan to improve bicycle parking at Davis Depot, and eventually added longer lockers, which fit the long-tail type of cargo bicycle. Five years ago the City declined to pursue acquiring facilities that would accommodate larger cargo bikes or bikes with  trailers for Davis Depot. Prior to the pandemic there were some ideas about adding over-sized bicycle parking in the one of the under-utilized buildings at the Depot, but nothing's come of it.

     

    273615950_1541649452881847_7777620194860680555_n

    There's secure parking for this vehicle at the train station… (Image: Urban Cycling Institute on Facebook)
    Bike-Europe-Pon-Takesover-Urban-Arrow-1024x695

    … but not this one (Image: Urban Arrow)

    The Bike Lock design:

    What makes it take “25 times” more time to breach than…. what? A cable lock, a top-of-the-line U lock? My chain and lock combo takes at least 3 to 4 minutes to cut in the field with an angle grinder  – ROAM takes 90 minutes?

    It’s “Cloud Connected”: What happens when it can’t connect for any number of reasons, as other systems can’t sometimes? Does it become unusable?

    Right now the “Lightning Bolt” locks take less time to cut than the more expensive hardened locks. The main reason it’s not happened a lot is likely due to the psychological disincentive of damaging city or university property, as opposed to personal property. Will existing racks be modified to be more resistant to quick cutting?

    Presumably the alarm sound comes from a small hole etc that’s also protected from water intrusion – have their been tests to seal this without setting off the alarm?

    If the QR code on the lock is damaged how can the user disable the lock?

    If the user loses their phone or its battery is dead, how the can the user disable the lock?

    How many regular bicycle users don’t have mobile phones?

    Is there a way for people who don’t have mobile phones to use the system?

    What supplies the power to the locks? A separate battery on each holding piece that requires a swap for a recharged battery? How often does it need to be recharged?

    Have there been tests where a unit’s alarm and lights were activated in the present of people not connected with the project? If so, what was their reaction?

    All the visuals in the attached promotional brochure are visualizations – no photos. Presumably some exist as they are being introduced BEFORE the BTSSC meeting and before its members formally-reviewed it. 

    *****

    I went through the entire staff report and interleaved comments and questions. It's long and it's here.

     

  • Letter from DISC developers to Davis Automobile Association

    AutoCenter
    It took some digging but I found a key letter from the DISC developers to the City of Davis Association of Private Motor Vehicle Sellers and Suppliers:

    Dear CDAPMVSS,

    Following are what we plan on the primary characteristics of DISC in regards to your organization’s mission:

    1 – Most of the day a connection by private automobile to Downtown Davis, UC Davis and West Sacramento will be extremely convenient and fast.

    2 – A private automobile will be required to conveniently and quickly travel to Pioneer Elementary, Nugget (on Mace) and surrounding stores, and of course to the Davis Auto Mall (identifiable by its bicycle logo from I-80).

    3 – Travel by cycling and walking to Harper Junior High and Korematsu Elementary will be significant until a crossing guard is killed and two students are injured at the intersection of Alhambra and Mace. In response we plan to place small posters at bus stops in the area to direct drivers to slow down. We were going to pretend to compromise and pretend to return to our spoken-only agreement the construction of a grade-separated crossing of Mace but in the end the Council didn’t ask for it.

    4 – Travel by automobile to schools outside of east Davis will be the majority mode, especially to Davis High School, and drivers will threaten students crossing E. Covell to get to Birch Lane Elementary, crossing F and 14th to get to North Davis Elementary and the high school.

    5 – The TDM plan will determine that carshare is not interesting for nearly all residents who have opted to rent a parking place near their home.

    6 – Caltrans has confirmed that they have no interest in assisting in building a safe and dedicated bicycle and pedestrian facility across I-80 in the vicinity of Mace, similar to their same position on the I-80 Managed Lanes project.

    7 – Some residents will ride cargo bikes to Target and surrounding shops until a user is killed at the corner of Mace and 2nd.

    8 – The Chevron station at Mace and 2nd will gain business.

    9 – Mode share of the fare-free shuttle to Davis Depot and Downtown will be insignificant due to duration and inability to match fluctuating schedule of Capitol Corridor trains due to problems outside of their control, such as shipping traffic on the Carquinez Strait that requires bridge interruption.

    Thanks, the DISC development team.

  • DISC 2022 Transportation – Planning Commission falls for Developer’s Trick

    TrapBacThe trap was set likely shortly after "DISC  2020" was defeated by voters.  When the developers of this peripheral sprawl – or I'll be nice and call it West West Sacramento – were planning to re-introduce it last year for a vote this year – they realized that a key demand was a grade-separated crossing of Mace. So they removed it from the Baseline Features… fully-intending to agree to do it as a concession.

    Back story

    The City Council-approved Street Standards (2016) don't mention e-bikes at all. What this means is that the width, curvature, and proper siting of infrastructure that would optimize the use of e-bikes – in particular the Type 3 variant that has assistance up to 28 mph – is totally missing in Davis, or more immediately in concepts, plans as well as development agreements and baseline features in current and near-future projects.

    To address this, over two-and-a-half years ago when I was on the Bicycling, Transportation and Street Commission (BTSSC) I got support for adding an item to the long range calendar which would address it; this first appeared on the LRC in September 2019, with a possible date of December 2019 for the agenda. (It is abbreviated somewhat erroneously as "intersection design guidelines / standards"). It has been pushed back repeatedly since then, and the BTSSC did not support forming a sub-committee about it during 2020.

    What this means is that significant concepts and projects which could alleviate transportation problems, such as Reimagine Russell, the new-ish Class I multi-user path on the south side of Russell (chronically and clinically-referred to as a "bike path) or smaller projects all over the city are not future-proofed for the increase of modal share for cycling we desperately need to improve everything from climate impacts to conviviality to fitness to transportation crashes. Our city is simply too large now in size to have a significant modal share with "acoustic" bicycles. Not convinced? Look at the low bike modal share from peripheral areas of town in the UCD Campus Travel Survey, which shows low share even for people with campus destinations where car parking is not always convenient, and not fare-free. It's not hard to extrapolate – necessary, as the City has essentially refused to do its own counts for years – that almost no one regularly rides from Mace Ranch or some other peripheral areas to Downtown for a coffee or beer – sort of the most normal thing in the Universe in a bicycle-branded cycling city.

    SurveyCycling

    UCD Campus Travel Survey 2019-2020 (pg. 30) – By bike, DISC is just over four miles from ARC, a central point on campus when considering agricultural facilities. This distance has about a 10% modal share for cycling, and includes mostly students, many who don't have their own cars.

    However, as we can see from the example above, the faster type of e-bikes are quite expensive. I've seen nothing lower than just over $3,000. Though important – or all – major arteries in Davis – should be optimized for this type of bike – the idea is not only to optimize for them but make safe for all users, including on acoustic bikes – it cannot mean that this type of bike should be essentially required to live here and enjoy the purported high quality of life. Infrastructure optimized for fast bikes is also a significant improvement for all bikes, as it's direct, requires a minimum of stops, is not shared with motor vehicles… or pedestrians and dogs.

    To be more precise, the goal should be the 15-Minute City. This is a relatively new standard or classification of a very, very old sometimes organic strategy to make key locations in a city within 15 min from anywhere else, for all means of transportation. This seems to also serve as a kind of proof of the bicycle modal share results in the Campus Travel Survey. It's definitely something that should be part of our new General Plan, or even worked on earlier by a joint Commission process (BTSSC, Planning… perhaps Natural Resources and Social Services…). I would argue that it should also be about effort, so a 5 or perhaps 7-minute walk is the equivalent of a 15 min bike ride. I've said that if kids can't walk unaccompanied 5-minutes from where they live to buy ice cream cones, it's a failure (and that's just one example, a single ice cream place or a truck at DISC doesn't make it sustainable.)

    It's also quite important to be reminded that the City of Davis has for over four years not had a senior civil engineer with a transportation focus. Many projects have gone forward – sometimes to completion, often with significant flaws – without the benefit of this experienced and wise counsel.

     

    Last Night

    At the Planning Commission review of Disc 2022 last night – and early this morning – I was actually quite impressed by the comments from multiple Commissioners regarding negative transportation issues of the planned project, and even the general discussion about its unavoidable impacts and uncertainly of benefits from transportation demand management… well, at least earlier in the discussion. Commissioner Shandy was particularly right on with her criticism of planned widening of Mace – presented by the developer as a kind of unquestioned religious observance – contradicts claimed benefits for people cycling and walking. There were other positive and thoughtful comments by a majority of Commissioners.

    I knew that the grade-separated crossing of Mace was a kind of sneakily-hidden prize and tried to point out in my sort of sloppy recorded comment that that a safer crossing of Mace would not on its own make DISC 2020 excellent for cycling (this is better than "cycle-friendly"), because of distance from Downtown and places further west, and besides that, safe crossings directly to the south along Mace across 80 would cost many millions and be very complicated (and at least in my head I know that Caltrans District 3 and the Yolo County Transportation District have withdrawn the earlier plan – it was supposed to be built first! – of a new bike and ped bridge across the Bypass as part of the I-80 Managed Lanes Project.)

    Screenshot from 2022-01-13 02-14-21

    Just an aside about the bandied about "globally-known sustainability of Davis": This was the air quality last night shortly after the meeting was over (via Purple Air)

     

     

    The Trap is Sprung

    Though it was fully-intended to be a positive thing and I will give credit to Commissioner Shandy, the discussion and lead-up to a vote turned sour when she proposed that a grade-separated crossing of Mace and a Class I trail across the undeveloped land south of Harper Junior High would make her feel better about the planned Mace widening and other traffic impacts. She suggested nothing about safe cycling and walking connections to other places, such as the Nugget and popular restaurants across 80. But the problem is that, for example, the area planned for housing at DISC 2022, on the north and eastern side of the project area, is more than 15 minutes away by bike from Downtown and at leat 20 to 25 minutes away from the UC Davis campus that is the raison d'être for DISC 2022! Moreover, the route has almost no optimized cycling infrastructure the whole way (varied from local streets to arteries, no protected bike paths, lack of priority at stops, etc… there is no proposal for any of this in any proposed development agreement or baseline features). But mainly it's too far by bike… never mind walking! Most of the time people – with free or with un-bundled parking – will take I-80 between campus and DISC, even more so to many facilities etc on the west side of campus related to agriculture. I-80 is such a fantastic route much of the day that nothing can compete with it, including shuttles and express buses, which I am sure will at best have a tiny modal share.  This creates huge challenges for any development more than 15 min away from key locations, and it means simply that they should not even be considered. (Oh, wouldn't it have been great if staff were directed to work on the General Plan and told the developers that there was no capacity to work on stuff that would very likely be in violation of a progressive outcome for it?)

    So the Planning Commission has recommended the two elements mentioned above that are supposed to address problems on Mace to the City Council. My conclusion is that the developers will signal their intention to accept them – perhaps with a little drama – and the Council will praise them for doing so. But again, even with everything promised (e.g. shuttles, TDM) and not promised (e.g. e-bike-optimized infrastructure) there's still no place for DISC. Still no way to successfully do something better than I-80 via private vehicle for anything but a minority. There's really nowhere to walk to from DISC. Hopefully the voters will see through this ruse and others and reject DISC 2020.

    Galadrieltempted

    In the ALTERNATIVE timeline, Lady Galadriel was tempted by but in the end did not succumb to the Power of the Grade-Separation ring

     

    Denethor

    In the REAL timeline, Lord Denethor, Steward of Gondor, was consumed by the Grade Separation Ring and driven mad.

     

     

    Question

    Last night I was quite surprised when the developer said with much conviction that baseline features were not necessary to enforce the creation of certain designs and programs at DISC 2022, as these would be required by CEQA. Then why have baseline features as a solution for any of these things, in all the discussion for years up until now? If a reader could enlighten me I would truly appreciate it.

    Afterword

    I am all for more housing – for all income levels, but with a significant proportion below market and lower income – and workplace and related development in Davis. I have never said I was against these things in any local discussions, for example in the Davis Vanguard. But they have to be infill, they have to be on greyfields such as parking lots, industrial areas along 5th St – not only the PG&E yard – and in the eastern side of South Davis and other areas much closer to Downtown and especially for what DISC 2022 purports to be about much closer also to campus. With electric shuttles on fixed routes, optimized cycling infrastructure, a new connection across 80 around L St., mixed-use above (existing) parking lots and so on many if not close to all of the actual benefits of a project like DISC 2022 can be realized. It's not impossible, it's not rocket science, it simply requires conviction, creativity and less b.s. and false claims about sustainability. Hopefully Council, Commissions… local media… and organizations such as Bike Davis and Cool Davis re-direct the citizenry towards an alternative to DISC or a truly sustainable version of it… closer to and integrated with the City of Davis and the UC Davis campus.

  • G St remains closed so a 5 year old can turn cartwheels 

    FIT House

    G Street shown as closed on Apple Maps

    By The Artery

    G St businesses await clean up and reopening but the part of the City Council wants G St closed permanently it seems so their 5 year old can turn cartwheels in the street. How quaint. How ageist. In the meanwhile seniors with mobility issues find it too difficult to come into the area, as communicated to us by our customers.

    At the 11/2/21 City Council meeting the council remained split 2:2 for partial reopening vs complete closure. The Downtown Business Association’s recommendation is for two-way traffic to resume with updated outdoor seating which is fair.

    But the Council’s arguments to keep G St closed permanently revolved around an absence of logic and fair reason. Arnold’s consideration to keep G St closed as a concession because 100% of the streets downtown are open to traffic shows he’s more interested in that detail than if 100% of businesses in Davis recover from the stress of the pandemic or not. Where is the city’s fairness to support all businesses to recover? Roseville, Palo Alto, Walnut Creek and many other cities around the country are in the news saying they’re reopening streets to help retail before the busiest shopping time of year.

    The Mayor of Davis also wants to keep G St permanently closed. She’s said she thinks we’re only concerned about aesthetics and parking spots. This isn’t all of it – she’s not listening. We’re looking at digital mapping systems which show G St as closed; not good. Look at what happened to K St in Sacramento in the 1960’s and again recently. Additionally, we see people urinating on the tree out front our business, vomit, graffiti and other signs of the worse side of humanity when they’re given access to areas not intended for recreation. This is “misbehavior”. Pledging to clean this up has proven a vapid promise – for four months. We see little follow through.

    (more…)

  • Stock up at Pre-Thanksgiving Market

    PatricksGardenMed

    Patrick Hoover of Patrick’s Garden is just one of dozens of vendors who will be at the Davis Farmers Market’s expanded Pre-Thanksgiving Market, from noon to 6 p.m. on Wednesday, Nov. 24 in Central Park. (Wendy Weitzel/Courtesy photo)

    The day before Thanksgiving, the Davis Farmers Market extends its hours. This year’s annual Pre-Thanksgiving Market will be from noon to 6 p.m. in Central Park, 301 C St., Davis.

    On Wednesday, Nov. 24, the market will have a bounty of seasonal produce, table décor, flowers, olive oil, honey and wine. Several bakeries will have fresh-baked items like pumpkin, apple, pecan and berry pies and pumpkin cheesecake; breads, stuffing mix and cookies.

    Year-round, rain or shine, the Davis Farmers Market is open from 8 a.m. to 1 p.m. on Saturdays. Normal Wednesday hours are 3 to 6 p.m. November through March, and 3 to 7 p.m. April through October.

    Other special holiday hours at the Davis Farmers Market are Fridays, Dec. 24 and 31, from 8 a.m. to noon. The market will be closed Dec. 25 and Jan. 1, but open from 3 to 6 p.m. on Wednesday, Dec. 29. For more information, visit https//davisfarmersmarket.org or visit it on Facebook or Instagram.

  • Russell Sprouts Little Imagination

    ReimagineInvertedDoes imagination require or at least benefit by transparency and a truly robust public process?

    For a year or so the City of Davis, UC Davis and Yolo County have been working with the private consultancy Toole Design and the public to "Reimagine Russell Boulevard".  City of Davis staff plan to update the City Council at this Tuesday's Council meeting.

    Following are comments I made on the survey which was planned to close on November 12th but is open as of this moment…

    My comments are split into two parts: First I focus on the process, next on the design. Process, today. Design, tomorrow (or Tuesday morning).

    *****

    1 – The project inexplicably has two websites, one for "administrative" reasons. There's never been an explanation for this.

    2 – On the admin. website there is a list of representatives of some sort from the city, the Community Steering Committee.  Two of them told me that they were not happy that it was only a sounding board and not really official – and there's no way specific way indicated to reach them. Additionally I was informed by a Committee member that they were not provided access to raw data from the first survey earlier this year. My impression is that the City learnt its lesson from the Downtown Plan process and decided to formally reduce democracy in the project. If no one visits the admin. website they won't even know about these people. At the very least the budget of nearly half a million dollars (!) didn't allow the consultants and so on to do more than a few public sessions over a year's time.

    (more…)

  • History of Davis’ Train Station

    By Aaron Wedra, Marketing Coordinator for the Hattie Weber Museum

    In 1864 it was determined that the California Pacific Rail Road would extend eastward from Sacramento over the Donner Summit route to become part of the transcontinental rail line.

    The “Cal-P”, as it was familiarly known to early-day railroad builders, was incorporated in January 1865, and was principally financed with British capital. Construction began at Vallejo in December, 1866, and the first rails were laid at the same place on April 10, 1868.

    Planners for the California Pacific Rail Road Company decided to build a line from South Vallejo to Sacramento which would also connect Marysville and Woodland at a junction in Davisville. Construction and grading of the rail bed began in Vallejo in December 1866 and the first rails were laid in April 1868.

    The construction of the first Davis depot began in July 1868 and the first passenger and freight service between Vallejo and Davis Junction began on August 24th, 1868. The fare was $3.00.

    (more…)

  • Letter to the City Council about G St Re-Opening

    The City Council will address the G Street Closure / Re-Opening tonight. It’s item 8 on the agenda if anyone is interested to chime in.  https://www.cityofdavis.org/city-hall/city-council/city-council-meetings/agendas

    G st closure

    Dear Mayor Partida, Davis City Council members, Liaisons and Managers,

    Thank you for your attention and consideration to re-open G Street to traffic.

    The city staff has published their recommendation for only a partial re-opening of G St, only one lane of traffic but the data from the DDBA’s survey contradicts their recommendation.  To their point of rescuing restaurants from failing during the Pandemic, they succeeded. It is a fact that a handful of restaurants are profiting with increased seating capacities that exceed the their TUP proposed usage. While still, retail and locally owned businesses are still teetering on closing. We’re wondering why the deadline for the street closure over shot the August 5th deadline without a word from the City. We were never asked about the street closure in the first place. I hope the City will try to help all businesses downtown from the economic effects of the pandemic to keep a diversified culture and serve the entire community. This should align with your goals for a vibrant downtown and thriving neighborhoods.

    I would kindly ask the City Council review this statistical information on the advantages, disadvantages and effectiveness of full and partial street closures adapted from www.trafficcalming.org

    (more…)

  • Please Re-Open G Street

    Davis10 copy

    By Adele Shaw

    I’m sharing this letter with people in Davis who might not be aware that retail businesses on G Street are suffering from the street closure.

    I’m an artist and one of 65 local artist/owners of The Artery Gallery located at 207 G Street. When the City issued “Temporary Use Permits” (TUP) and closed G Street, we supported it. But as an unsupervised, unkempt bacchanal unfolded we began to look forward to G Street’s re-opening.

    The original re-opening date of August 5th came and went. No information came from the City of Davis as the closure was extended without a word to affected businesses. Today, our customers continue to rant with frustration over the street closure’s unkempt conditions and filth.

    A permanent closure of the street will likely cause the death of many of the non-restaurant businesses on G Street.  The city issued TUP’s during “emergency” times but they’ve created another emergency all together- an inequitable restaurant takeover on G Street. It may look like a party when you’re picking up a pizza or having a beer, but it’s not an equitable, harmonious party.

    Non-restaurant businesses on the 200 block of G Street outnumber the restaurants more than 2:1 (24 retail, consulting or other businesses to 11 restaurants). Yet the retail, consulting and other businesses on G Street continue to suffer. We’re experiencing diminished income and are losing customers because of the street closure. I expect this will get worse as the winter comes.

    I wonder what’s the purpose of closing G Street?

    Is it a thoroughfare for pedestrians from one place to another? No.

    Does it provide pedestrian access a particular destination? No.

    Is it part of a multi-modal urban network to develop and foster a downtown core with flourishing businesses of all kinds? No.

    (more…)

  • A rare compilation of photographs and images of the historic Davis Arch

    2

    Davis Arch image

    (From press release) Enjoy a rare compilation of photographs and images of the historic Davis Arch. When scrolling through the images, please pay attention to the captions for each.

    Included below is a brief history of the creation and ultimately the destruction of the Davis Arch that includes the establishment of the Chamber of Commerce and the Women's Improvement Club. It is interesting to note that the Chamber still puts on occasional cleanup days, a tradition as old as the chamber itself.

    See the individual photo captions to learn more about the rise and fall of the arch as well as its revival in multiple murals and other media.

    An excerpt from "Davisville '68 The History and Heritage of the City of Davis":

    (more…)