Davisite Banner. Left side the bicycle obelisk at 3rd and University. Right side the trellis at the entrance to the Arboretum.

Month: January 2022

  • Dramatic reduction in Baseline Features in DiSC 2022

    Screen Shot 2022-01-11 at 9.10.17 PM
    The following email was sent to the Planning Commission in the evening of Jan 11, 2022.  (The agenda for the meeting can be found here):

    Dear members of the Planning Commission,

    I am writing concerning item 6A of your meeting tomorrow (Jan 12), the public hearing on the DiSC 2022 project.

    As you may recall, for a project that will be facing a Measure J/R/D vote, the Baseline Features (BFs) are key.  The BFs are the only features that are guaranteed parts of the project.  In contrast, any features that are part of the Development Agreement can be changed by the City Council.  So, in terms of what the project is, and what the voters will be voting on, it is extremely important to know what the BFs are.

    As it turns out, a number of BFs have changed or been eliminated in the change from the old DISC (rejected by voters in Nov 2020) and the current DiSC 2022 proposal.  Here is my count:

    • 19 BFs essentially unchanged
    • 2 features enhanced
    • 5 BFs changes due to reduction in the size of project (e.g, less housing)
    • 7 BFs that offer a weaker version of feature unrelated to changes in project size
    • 13 features eliminated altogether (appeared in old DISC but not in DiSC 2022).

    Of course, whether these changes are important or not is for you and others to determine, but some of them are arguably important.  Indeed, there are changed or eliminated features in each of the main categories, reducing the sustainability, housing, transit, etc., features of the project.

    I urge you as Planning Commissioners to query the developer about all of these changes in order to determine if they are justified.

    Attached please find a spreadsheet that shows these changes.

    The BFs for old DISC can be found online in the following document: http://documents.cityofdavis.org/Media/CommunityDevelopment/Documents/PDF/CDD/Aggie%20Research%20Campus/20-111%20-%20DISC%20Project%20Ballot%20Measure.pdf

    Sincerely,

    Roberta Millstein
    Davis citizen
    Former chair, Open Space & Habitat Commission

    **** Download Baseline feature comparison *****

  • Should Davis spend millions of dollars on a ladder fire truck?

    This article was originally posted on 5/16/21. It is being reposted today because the City Council will be considering this item at its meeting tomorrow, 1/11/22. The anticipated one-time capital purchase expense for the fire apparatus and associated equipment is approximately $2.15 million.

    UC Davis Ladder Fire Truck no 34

    UC Davis's Ladder Fire Truck – Truck 34

    By Roberta Millstein

    Is now the time for the City of Davis to be spending millions of dollars on a ladder fire truck when it currently only needs this type of truck approximately once per month at most, when it can currently borrow UC Davis’s ladder truck for free?

    What information do we need to answer this question?  What do we know and what do we need to know?

    According to the Davis Enterprise, on March 16 the Davis City Council “expressed unanimous support for acquiring a ladder truck for the Davis Fire Department and directed staff to move forward both on securing a detailed cost estimate for a truck as well as developing plans to modify the downtown fire station to accommodate it.”

    The estimated costs discussed thus far are as follows (with the City possibly being able to obtain some grants to offset some of these costs):

    (more…)

  • Effects of Excessive Increases in City of Davis Employee Compensation from 2011 to 2020 on the City’s Ongoing Budget Crisis

    by Alan Pryor

    This author previously published an analysis of annual compensation and raises given to City of Davis employees from 2011-2018 and compared them to a government-calculated inflation rate to determine the impacts these raises had on the City budget (see article here). This article updates those disclosures through the calendar year ending 2020.

    I. EXECUTIVE SUMMARY

    a. Summary of Increases in Total Compensation (Pay and Benefits)

    The actual average total compensation (Pay and Benefits) in 2020 for City of Davis full-time, year-round (FT) employees was $163,244 (see Appendix B and below). This is a 10.7% increase from 2019 and far exceeds the annual rate of inflation of 1.5% in 2020 as determined by the US Bureau of Labor Statistics for Bay Area Urban Wage Earners & Clerical Workers ("Bay Area CPI "- see https://data.bls.gov/timeseries/CWURS49BSA0).

    The average increase in total annual compensation (Pay and Benefits) for City of Davis FT employees has been 6.0% per year from 2011 through 2020.  This is more than twice the average annual rate of inflation of 2.7% during the same period as determined by the Bay Area CPI.

    If annual total compensation increases to FT employees had been instead limited to the Bay Area CPI rate of inflation from 2011 to 2020 (i.e.2.7%), the average total compensation otherwise received by FT City of Davis employees in 2020 would have otherwise been $124,169 – or about 24% less than the $163,244 in average total compensation actually received.

    b. Summary of Increases in Pay Compensation (without Benefits)

    Similarly, the actual average annual Pay (without Benefits) paid to City of Davis FT employees in 2018 was $107,683. This is a 7.0% increase from 2019. The average increase in annual Pay (without Benefits) for City of Davis full-time, year-round (FT) employees has been 4.6% per year from 2011 through 2020 compared to the average annual rate of inflation of 2.7% during the same period as determined by the Bay Area CPI.

    If annual Pay increases to FT employees had been limited to the Bay Area CPI rate of inflation from 2011 to 2020 of 2.7%, the average Pay otherwise received by FT City of Davis employees in 2020 would have instead been $92,439 – or about 14.2% less than the $107,683 average Pay actually received.

    c. Summary of Impact of the Excessive FT Employee Compensation on the City's Budget

    The annual differences (i.e. payroll savings) between the actual total Pay and Benefits paid by the City to all FT employees from 2012 through 2020 and that which would have been paid if annual increases had instead been held to the CPI is very substantial and ranges from $3.645 Million in 2015 to $12.387 Million in 2020.

    On a cumulative basis, the City has paid in excess of $54 Million more to FT employees in Pay and Benefits from 2012 through 2020 compared to if annual total compensation increases otherwise been held to increases based on the Bay Area CPI. 

    That additional $54 million could have been very beneficially used in the intervening years to resurface many additional miles of the Davis streets and bike paths in most need of repair while still providing adequate and fair annual increases in employee compensation to match inflationary pressures on their costs of living.

    The most recent trend in accelerating employee salaries and total compensation is ironic given the current City Council's self-proclaimed fiscal responsibility and laser-focus on cost containment.

    (more…)

  • Sign the Petition: PRESS PAUSE on the Teichert Shifler Mining and Reclamation Project

    This is a summary of our longer Petition that can be found and signed at https://chng.it/fJWfym9Gx6

    We are Yolo residents concerned about the potential adverse impacts of the Teichert Shifler Mining and Reclamation Project. On Tuesday, 11 January at 1:00 pm the Yolo Board of Supervisors will discuss and vote on the application. We urge the Supervisors to vote NO.

    Here we emphasize Risk of Water Contamination, Loss of Prime Farmland, and Liability.

    (more…)

  • 1/6 Vigil in remembrance of those who defended our Democracy

    LWVFrom the League of Women Voters:

    Dear Friends,

    Welcome all to a New Year and best wishes for a healthy and peaceful 2022.  

    Regrettably, what first comes to our mind this month might be the remembrance of last year and the January 6th terrorist attack on our National Capital. Our Democracy survives, but the actions on that day remind us that we all need to actively protect our Republic and our voting rights. With that in mind, LWVDA leadership joins the National League of Women Voters (LWVUS) by asking our membership to urge Congress and the President to pass federal legislation protecting our right to vote and our democracy.  

    January 6th Day of Remembrance and Action: This Thursday Jan 6th at 5:15 pm in Davis Central Park, the Davis League will host a local vigil in remembrance of those who defended our Democracy last year and in support of the League’s 101-year position on voting rights advocacy and representative democracy. In this we join other LWV state and local leagues who will host in-person and virtual events to commemorate the remembrance. We invite you to join this show of unity at the public remembrance event. Register here: https://www.mobilize.us/mobilize/event/434619/

    Take Action: As League members, we believe a January 6th remembrance also offers an opportunity for us to take action. We encourage your action this month in supporting passage of 2 federal bills currently stalled in the Senate: the Freedom to Vote Act and the John Lewis Voting Rights Advancement Act.  

    Please take the time this week and join your fellow League members by going to this Action Link to learn more about this legislation and take individual action. By contacting Senators Feinstein and Padilla to push for passage of this important legislation we can truly recognize the heroism of the men and women that protected the Capital and legislators of all political parties in defense of Democracy on January 6th, 2021. 

    …..

    Happy New Year,
    Mary Jo Bryan
    President
    LWV Davis Area

  • Mercury Contamination in Cache Creek: We Need More Answers

    By Charles B. Salocks, PhD

     Teichert Construction is applying for a Yolo County permit to mine gravel on more than 250 acres of land in lower Cache Creek west of Woodland that is now being used for agriculture.

    This proposal is problematic because the Cache Creek watershed naturally contains substantial deposits of mercury ore. It includes a US EPA Superfund site, Sulphur Bank Mercury Mine, located at the east end of Clear Lake.

    According to the Environmental Impact Report (EIR), at the end of 30 years the mined property will be reclaimed: approximately two-thirds of the land area will be converted back to agricultural use and one-third will become a permanent water impoundment (or ‘pond’) and turned over to the County. The property will not be restored to its original state, at least not in the foreseeable future.  

    A toxic compound called methylmercury is produced by certain types of bacteria that live in water and sediment where the concentration of dissolved oxygen is very low. This condition can occur at the bottom of ponds or lakes, such as the reclaimed water impoundments in lower Cache Creek where open pit mining has already occurred.

    (more…)